Injection molding robot site installation environment requirements, your workshop suitable for the installation of the robot?
[2024-01-13]

Injection molding robot site installation environment requirements, your workshop suitable for the installation of the robot?


What are the requirements for the installation of injection molding robots on the site? What are the conditions for the workshop equipment to install the manipulator?

Injection molding manipulator automatic production line for equipment requirements

1, the production line equipment fixture has the function of automatic clamping and loosening, under the control of the manipulator system signal to achieve automatic clamping and loosening function to cooperate with the loading and unloading action;

2, the sheet metal of the production line equipment reserves the skylight position or the automatic door module, which communicates with the corresponding electronic control signal of our company and the manipulator;

3, the production line equipment has communication through the heavy-duty connector (or aviation plug) connection to communicate with the manipulator;

4, the production line equipment has an internal (interference) space greater than the safe range of manipulator claw action;

5, the production line equipment to ensure that the fixture positioning surface no residual iron filings, if necessary to increase air blowing cleaning (cleaning chucks need to rotate);

6, the production line equipment is good chip breaking, if necessary to increase our auxiliary high-pressure chip breaking device;

7, the production line equipment needs the machine tool spindle to stop, increase this function and provide the corresponding electrical signal.

Injection molding manipulator automatic production line requirements for the field environment

1, ambient temperature: -10 ~ 50 ℃;

2, relative humidity: 20% ~ 75%;

3, vibration: vibration acceleration is less than 0.5g;

4, power supply: three-phase 380V;

5, voltage fluctuation range: ±10%;

6, frequency: 50HZ;

7, the need for air source: 0.5Mpa or more;

8, the robot control cabinet power supply is required to be equipped with an independent air switch;

9, the robot control cabinet must be grounded separately, grounding resistance is less than 1Ω;

10, no corrosive gas at the work site;

11, workshop foundation: conventional cement ground treatment, transmission line equipment installation base using expansion bolts and fixed with the ground, other chemical anchors and fixed with the ground.